The Savings in Multiple Part Workholding

"The Proof is in the Productivity"

CNC MACHINING
Holding 7 parts at the same time
saves 63.5 seconds per piece

DESCRIPTION:
CNC Machining of a 9/16" hex
with four (4) tool changes
Tool 1: Face mill and side mill two sides
Tool 2: Spot drill in four places
Tool 3: Drill four holes to .125"
Tool 4: End mill an arc

WORKHOLDING:
Conventional Workholding: 1 piece at a time
Lassy Rapid Load System: 7 pieces at a time

PRODUCTIVITY GAIN:
CONVENTIONAL PIECES PER HOUR = 36
LASSY SYSTEM PIECES PER HOUR = 99
INCREASE IN PRODUCTION = 63 pcs.@ 175%


MILLING
Holding 9 parts at one time
Saves 31.1 seconds per piece

DESCRIPTION:
Milling a short slot 0.093" x 0.093" in 3/8" diameter 4130 CRS

WORKHOLDING
:
Conventional Workholding: 1 piece at a time
Lassy Rapid Load System: 9 pieces at a time

PRODUCTIVITY GAIN:
CONVENTIONAL PIECES PER HOUR = 103
LASSY SYSTEM PIECES PER HOUR = 923
INCREASE IN PRODUCTION = 820 pcs. @ 631%


GRINDING
Holding 11 parts each time
Saves 34.5 seconds per piece

DESCRIPTION
:
Surface grinding shoulder cylinders
A2 hardened to 55-60 Rockwell
Grinding to a 63 micro finish and square
within 0.001" to the diameter

WORKHOLDING:
Conventional Workholding: 1 piece at a time
Lassy Rapid Load System: 11 pieces at a time

PRODUCTIVITY GAIN:
CONVENTIONAL PIECES PER HOUR = 95
LASSY SYSTEM PIECES PER HOUR = 1,028
INCREASE IN PRODUCTION = 933 pcs. @ 982%



DEEP SLOT MILLING
Holding 5 parts for each cycle
Saves 30.4 seconds per piece

DESCRIPTION:
Deep slot milling in a 3/4" square 1018 CRS Milling a 1/8" x 7/8" slot with
a 1/8" gripping surface depth

WORKHOLDING
:
Conventional Workholding: 1 piece at a time
Lassy Rapid Load System: 5 pieces at a time

PRODUCTIVITY GAIN
:
CONVENTIONAL PIECES PER HOUR = 60
LASSY SYSTEM PIECES PER HOUR = 120
INCREASE IN PRODUCTION 60 pcs. @ 100%

Send us a part and a print. We'll design and recommend a workholding system that maximizes your production.
No obligation.